SIENCA technical reference · DAC

Automatic load shedding in the CEPM system.

CEPM electrical system

Scope confirmed by SIENCA.

Conceptual screen with simulated data: under-frequency load shedding with two generators, load priorities and frequency response after a simulated event.
Conceptual screen · Simulated data. It does not represent an actual project or commercial interface.
  1. 01 / Need

    Shed load following generation loss to help maintain generation–demand balance and system stability.

  2. 02 / SIENCA’s scope

    SIENCA implemented a DAC system at CEPM capable of shedding system load following a loss of generation.

  3. 03 / Implemented function

    Automatic load shedding to help maintain system stability.

Keep exploring

Connected solutions.

Let’s talk about your next project

Your operation deserves a tailored solution.

Tell us what you need to integrate, control or improve. Understanding your project is the starting point.

Let’s discuss your project

Share your needs, country and project stage.